9/29 construction forecast

Building 13 perimeter site fence

  • Viewing windows will be installed over the next 2 weeks.
  • Existing lighting along the north colonnade will be repaired.

Pedestrian Safety

  • Convex mirrors have been installed at blind corners of walkway and at crossing at buildings 9 and 13. 
  • Installation of signage to discourage bike riding through perimeter walkways will be installed.

schedule

MIT.nano work zones