New coaters set up in Fab 12

MIT.nano staff are setting up the new coaters in Fab 12 as we prepare for the facility ramp up following the COVID-19 shutdown. The coater pictured here has plumbed resist for automatic dispensing; the pumps and dispense mechanisms are being configured and calibrated.

New coater in Fab 12